Rigger Level 3 Aramco Notes [patched] Jun 2026

Guiding crane operators safely during lifting and positioning, using standardized crane signals.

If Load is known: Multiply by factor for choker/basket hitches (e.g., 0.75 or 1.5 depending on hitch). rigger level 3 aramco notes

A lifting plan is required, detailing the weight of the load, equipment used, a sketch of the lift, and risk analysis. detailing the weight of the load