Tower Crane Dismantling Method Statement «TRUSTED – 2026»
This method statement covers the safe dismantling of a [Insert Crane Model] tower crane from a [Insert Site Address] construction site. The objective is to reduce the crane to manageable components using a mobile assist crane (or climbing crane/jib crane method) with zero incidents.
For cranes anchored into the building floor slabs, the structural engineer must provide a patching and reinforcement repair method statement to fill the voids safely. tower crane dismantling method statement
Attach tag lines to both ends of the main jib to control rotation during lowering. This method statement covers the safe dismantling of
Qualified professionals responsible for mechanical dismantling. Attach tag lines to both ends of the
[Step 1: Remove Counterweights] ──► [Step 2: Disassemble Jib/Boom] ──► [Step 3: Remove Counter-Jib] │ [Step 6: Lower Tower Mast] ◄── [Step 5: Remove Slewing Unit] ◄── [Step 4: Remove Tower Apex] Step 1: Counterweight Removal
Cranes – Safety – Tower Cranes (European Standard).
Heavy-duty steel or timber mats to distribute the mobile crane’s load on the ground. Rigging & Hand Tools